PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Waterproofing foundation walls at Elev. 1,2,3 Facing South-East (800x600).jpg Water Penetration Test at 10 lb.-sq. ft. Left Side (Middle Section) (800x600).jpg Rebars at footing layout at Elev. 7-Stair -4,5 Facing South-East (800x600).jpg Set Rebar along the footings at Elev. 7-Stair -4,5 Facing South -2 (800x600).jpg Set Rebar mats at Elev. 1,2,3 Facing South-East (800x600).jpg Water Penetration Test (Lower Section) -2 (800x600).jpg Water Penetration Test (Lower Section) (800x600).jpg Water Penetration Test Side view (Middle Section) (800x600).jpg Water Penetration Test Front view (Upper Section) (800x600).jpg
Previous pageNext page Set Rebar mats at Elev. 1,2,3 Facing South-East (800x600)
Set Rebar mats at Elev. 1,2,3 Facing South-East (800x600)